Corrective Actions Team Meeting (CAT)


Volver al Inicio

TASK SUMMARY

Total de Tareas: 50 Total OPEN: 25 Total CLOSE: 23
52.1% OPEN
47.9% CLOSE

List of Corrective Actions

Creador Descripción Área Acción Responsable Status OPEN/CLOSE Actions
Alejandro Duque Cutting faston Terminal in COMBO PCBAS. This cutting process was added to the process due of the lead of the terminal hit the Encoder Cover on the Residential operators Electronicos Review if is possible to make a change in the encoder cover PN 40692A to avoid this issue. Slot in the plastic can help to eliminated this issue. Roberto Ulloa Roberto to mark up an encoder drawing to talk to Engineering for a quote to modify the cover. New worikng on it Actualizado el: 10-02-2025 Actualizado el: 03-03-2025 Editar
Roberto Ulloa Evaluacion de tableros de combo 41145 que requieren reparacio/retrabajo Electronicos Evaluar top 5 issues en ICT de los datos mandados por Josias. Codigos de falla 5-23; R71; U3; IC y R76 Alejandro Duque Ya se indetyificaron los top5 ; 5-23 requieren analisis individual: los R71; reemplazar LGA; U3 y R76 problema de delaminacion (scrap); revisar metodo para idnetificar mejors en depanalizado.; IC requieren analisis individual. Actualizado el: 10-02-2025 Pendiente status Actualizado el: 27-02-2025 Editar
Roberto Ulloa Evaluacion de tableros de combo 41145 que requieren reparacio/retrabajo Electronicos Evaluar top issues en Funcional de los datos mandados por Josias. 174 PCBA con codigo "FULL RUN DOWN" Guillermo Maldonado de 24 del lote , 6 pasaron. Para comprobar intermitencia, probar estasn6 PCBA 20 veces; Contienur con buzqueda de causz raiz. Actualizado el: 10-02-2025 Todas las veces (20) pasaron las pruebas. Soldadura en un pad del BGA parece ser la cuaza raiz; todavia se evalaua para confirmar. Para lunes sabriuamos si es la causa o no. Actualizado el: 27-02-2025 Memo ausente Actualizado el: 03-03-2025 El proceso para confirmar causa raiz es desoldar y solder LGA nuevo, y regresar al "malo" de nuevo, sin embargo el fixture para desoldar LGA aun no esta disponible, manualmente es dificil soldar este componente (usando solo la pistola de calor), se esta evaluando soldar directo cada PAD de PCB a cada PAD LGA (con cables) y asi descartar insuficiencias o cortos. Actualizado el: 13-03-2025 17:05:04 Editar
Roberto Ulloa FPY Electronics "Top issues de Diciembre" Electronicos Evalauar top issues en area de SMT en los paretos de Datos de Diciembre (Levantado y movidos en capacitores ) Alejandro Duque En evaluacion Actualizado el: 10-02-2025 Pins set up improved? Como vamos? Actualizado el: 24-02-2025 Pin set up verification and adjujstmest as needed; Colleting date thru February to look for pattern or any other action to take. Actualizado el: 27-02-2025 Antes de limepza y ajuste.117 def. top 1,2 3 are D9, C17, C14 respectivamente. Despues 79 en mismo periodo comparar contra produccion. Actualizado el: 03-03-2025 Editar
Roberto Ulloa FPY Electronics "Top issues de Diciembre" Electronicos Evaluar top issues en area de TH en los paretos de Datos de Diciembre (Levantados en switches y Connecors e insuficiencia de soldadura en Switches y Diodos ) Guillermo Maldonado In proceso Actualizado el: 10-02-2025 Failures were real. Looking to improved Switch holders Actualizado el: 24-02-2025 se agrego peso a 2 holder y parece que funcionan mejor. Holders tienen deformacion que pudiera estar causando el problema; Actualizado el: 27-02-2025 Editar
Eduardo Vargas 21 pieces with the issue with serials, don't match in sanwa model NGX 1/23/25. Scanner time verification. Se verifico que el escaneo rapido cauza este problema. No se le puede agrear nadamas a PLC actual. Se necesitario una extension. Evalaur costo y tiempo para agregar capacidad en PLC Rodrigo Velazquez Alfredo S. (open). Actualizado el: 27-02-2025 Actualizado el: 03-03-2025 El proyecto de expansión de rack del PLC está bajo Ricardo Ibarra. Fecha para recibir materiales e implementación es 14-ABR. Actualizado el: 13-03-2025 17:08:19 Editar
Roberto Ulloa Incorrect Software Label on PCB 37418R, was labeled as the standard software Electronicos Need to define actios for incorrect Labeling process follow; Missing QA inspection during refill/reprinting Alejandro Duque Implementado bajo desviacion en 37418 ; Pendiente1/25/25 Un GCR en proceso para hacer esta mejora; Hacer una desviacion para implemetar ASAP. OMSs queddaran actualizas para Febrero 15 mas tardar. 1/13/25 GCR/GCO to merge 2 labels information inot one. Software version, Manufacture dtae and part number. Expected by 01/27/25 Actualizado el: 10-02-2025 Actualizado el: 27-02-2025 Editar
Roberto Ulloa Incorrect Software Label on PCB 37418R, was labeled as the standard software Electronicos Need to define actios for incorrect Labeling process follow; Missing QA inspection during refill/reprinting Andres Hernandez NO aplica para prodccion, solo acciones en area de elecgronicos 1/25/25 Un GCR en proceso para hacer esta mejora; Hacer una desviacion para implemetar ASAP. OMSs queddaran actualizas para Febrero 15 mas tardar. 1/13/25 GCR/GCO to merge 2 labels information inot one. Software version, Manufacture dtae and part number. Expected by 01/27/25 Actualizado el: 10-02-2025 Actualizado el: 10-02-2025 Editar
Roberto Ulloa Incorrect  packing Labeled of part number 39934U. Current print set up allows to print any model and associate incorrectly printed a different model(39934S) in a refill of packing labels, also he does not follow the process of send the first label of the refill to QA for Validation JackShaft Modify the setup of each packing label printers, the new set up is going to link the current model charged in the line with the printer, this is change will allow  to the printer to only print the label of the model  that the line is currently running and will not print any other model of label Rodrigo Velazquez IMpresora instalada y ligada a la estacion de empaque . Se monitoreara por unas semanas . Y revisar poder candadear el buton de pausa de la impresora. 1/27/25 Febrero 17 queda instalado para su validacion. /25/25 Rodrigo checara como vamos con esta actividad. 1/13/2025 waiting for update form manufacturing Actualizado el: 10-02-2025 Completed Actualizado el: 27-02-2025 Editar
Roberto Ulloa Incorrect  packing Labeled of part number 39934U. Current print set up allows to print any model and associate incorrectly printed a different model(39934S) in a refill of packing labels, also he does not follow the process of send the first label of the refill to QA for Validation JackShaft Revisar en que otras areas applica esta misma mejora Rodrigo Velazquez 1/27/25 Febrero 17 queda instalado para su validacion. /25/25 Rodrigo checara como vamos con esta actividad. 1/13/2025 waiting for update form manufacturing Plan preliminar de este project para la proxima junta Actualizado el: 27-02-2025 Editar
Roberto Ulloa Pistola Bajo Torque Comercial Aumento de Frecuencia en el chequeo de Pistolas neumaticas. Empezando desde la semana 39 se aumentara la frecuencia 3 veces por semana Roberto Ulloa done Actualizado el: 10-02-2025 Editar
Roberto Ulloa Pistola Bajo Torque Comercial Verificar la excesiva variacion de los desamadores Alfredo Santillana Done Actualizado el: 10-02-2025 Editar
Roberto Ulloa Pistola Bajo Torque Comercial Cambiar desarmadores criticos con mucha vairacion por nuevos desarmadores Alfredo Santillana Working on it; uno mas pendiente en Station 1 de SX ~ date; TBD Alfredo to provide it Actualizado el: 27-02-2025 3 semans para cambair la que falta (critrica) Actualizado el: 03-03-2025 Editar
Roberto Ulloa Pistola Bajo Torque Comercial Estudio de variacion de torque mostro que reguladores reducen la variacion mas del 50%; Agregar reguladores en desarmadores Alfredo Santillana Working on it Actualizado el: 27-02-2025 Editar
Roberto Ulloa Pistola Bajo Torque Comercial Evaluar la instalacion de "acumuladores de aire comprimido" en cada line commercial para reducir aun mas la varicion de torque. Alfredo Santillana Working on it; Se puso en HOLD due to too much noise; Keep working on the other action to reduce/Eliminate variation Actualizado el: 27-02-2025 Esta actividad favor de descartar, no es requerida en nuestro proceso. Actualizado el: 13-03-2025 17:12:40 Editar
Roberto Ulloa Pistola Bajo Torque Comercial Revisar registro de mantenimiento de desarmadores para empezar a colectar datos que nos lleven a definir plan de mantenimiento preventido en lo que repecta a cambios de resortes. Resortes que tienen vida, la cual depende de la cantidad de veces que estos sean ajustado. Estimar cuando se tienen que cambiar lso resortesm antes de que presneten fallas que requieran mantenimiento "correctivo" . Alfredo Santillana Working on it registrando datos para defir posibles mantenimientos preventivos Actualizado el: 27-02-202 No se esta tomasdo este dato. Hacer una junta con Randy para que nos defina que hacer. Actualizado el: 03-03-2025 Editar
Eduardo Vargas COVER con serigrafia borrosa NGX Evalaute new samples sent by PREMERE. Roberto Ulloa Parts are here; Evlaution by Wednesday 2/12/25 01/25/25 sanwa cover reported con mismo issue. Premere pendiente ocn feedback. 01/06/25 premere uPDATE NEEDED. 11/04/24. Se=giue el prolema reportadoa a PREMIER> Pedir undates 10/7/24 Evaluart samples ….thes should be at 093 already 9/30/24 PREMERE confirmo que mejoro la impresion de logo . Muetsra en caminos. 9/4/24 Eduardo mandara correo diario de los que salgan por turno. Ultima mejora de PREMERe (dejo curar la pintura antes de empacar) las muestars mejoraron mucho. El siguiente recibo debe lleagr con la mejora apra hacer un muestreo mayor. Actualizado el: 27-02-2025 Actualizado el: 03-03-2025 Editar
Eduardo Vargas COVER con serigrafia borrosa NGX Evalaute new samples sent by PREMERE. Alfredo Santillana Parts are here; Evlaution by Wednesday 2/12/25 01/25/25 sanwa cover reported con mismo issue. Premere pendiente ocn feedback. 01/06/25 premere uPDATE NEEDED. 11/04/24. Se=giue el prolema reportadoa a PREMIER> Pedir undates 10/7/24 Evaluart samples ….thes should be at 093 already 9/30/24 PREMERE confirmo que mejoro la impresion de logo . Muetsra en caminos. 9/4/24 Eduardo mandara correo diario de los que salgan por turno. Actualizado el: 27-02-2025 Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) Electronicos Keep identified the PCBAs received from any line Josias Ramirez 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas Actualizado el: 10-02-2025 Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) Electronicos PCBAs shall come separated from any production line to allow Josias to handle them better thru the proper route. Insrtead of sending them all to repair. Andres Hernandez 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas Actualizado el: 10-02-2025 Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) Electronicos Make sure all PCBAs returned from any line are confirmed to be bad by "turning off and on" the problem before considering returning the PCBA as defectivre Alfredo Santillana 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) Electronicos All confirmed bad and rejected PCBAs shall be identify with at least on of the: a) Symptom of the failure found b) PCBA defect if known Alfredo Santillana 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) Electronicos The repair register sheet to be updated to add the failure or symptom the PCBA was report with; this will help to get to root causes of issues found and as trouble repair shooting data Guillermo Maldonado 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) Electronicos Take the repair station off the line; apart from production material to avoid mixed PCBAs (good and Bad) Alejandro Duque 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) Electronicos Repair instructions provided and then forgot them or not followed by new techs on such areas Create OMSs for repair staions specifically for PCBA handling and identification Alfredo Santillana 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) Electronicos Create/Write procedure for proper dispostion of PCBAs being rejected from repair stations Roberto Ulloa 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) Electronicos Returned PCBAs rack to be identified for proper handling; Identify them by family, areas or PCBAs what ever is better Roberto Ricarte 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) Electronicos Definir/ crear area para trasbase de PCBAs de RT a area de reparacion Rodrigo Velazquez ARea, Rack listo; esperando a Ricarte para que mueva el material que esta en esa area. 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas Actualizado el: 10-02-2025 Actualizado el: 10-02-2025 Ya quedo el area definida con equipo requerido Actualizado el: 27-02-2025 Editar
Roberto Ulloa Commerical Area with very old OMSs. Comercial PLAN para reeemplazar/actualizar las OMSs para commercial; Luis Vera Vera mando correo con porcentatje 30% 01/27/25 Linea SX Total modelos = 763, de los cuales 157 modelos se han corrido en 2024, Avance de actualizacion: Modelos ya actualizados con nuevo formato 43, en proceso de elaboracion 10, OMS en formato antiguo y pendientes de actualizar 103, fecha tentativa para finalizar los 103 modelos 05-Dic-2025 01/27/25 Linea HX Total modelos = 329, de los cuales 89 se han corrido en 2024, Avance de actualizacion: Modelos ya actualizados con nuevo formato= 42, en proceso de elaboracion 5, OMS en formato antiguo y pendientes de actualizar = 42 fecha tentativa para finalizar los 42 modelos = TBD 01/25/25 Plan con cantidades y porcenaje de progreso. 01/13/25 Still waiing for the information from Engineering (Look for Rodrigo/Brian email for details) 01/06/25 HS, HR, Trolley are completed; Dany/Brian to confirm % of progress. Actualizado el: 10-02-2025 Actualizado el: 10-02-2025 Actualizado el: 10-02-2025 ~1092 total number; 298 completed; 27% both lines todos los modelos; previous 30%-32% was for high runners only. Actualizado el: 27-02-2025 Actualizado el: 10-03-2025 17:14:49 Editar
Andres Hernandez 41145X accumulado despues de 3 reparaciones; Aprox 400pcs Electronicos Poner el lista de material pendiente por analisis mas detallado Josias Ramirez Cerrar esta task. se le da seguimineto en otra accion Que mas se necesita para cerrar este punto???? 01/25/25 se mado correo con cantidades, fallas y origen de falla. 01/13/25 After checking all 2921 in stock, we got 862pcs (683 de ICT ; 10 de Progrmaming, 113 frequnecy ; 56 fucntiona); +2K were due to the original issue with tester already fixed. Actualizado el: 10-02-2025 Actualizado el: 10-02-2025 Editar
Roberto Ulloa Evaluacion de mejora en estacion 8 de MZ. Comercial (mejorar manejo del receiver por posible daño) Andres Hernandez Adres confirmar en impacto para tomar desiciones 1/25/25 PENDING 01/13/25 Still Pending 01/6/25 CUANTIFICAR IMPACTO PARA DECIDIR 11/04/24 Evaluar ekl eimpcato en timepo de ciclo. No se ha visto problem ni en proceso ni de camnpo, era simplemente mejorar ocntinua, PONER en HOLD hasta terminar evalaucion/7/24 waiting to run this model to completed evaluation/verification. 9/30/24 Evaluar en corrida mas gfrande para confirmar 9/24/24 under evaluacion Actualizado el: 10-02-2025 Actualizado el: 10-02-2025 Actualizado el: 10-02-2025 OMS to be completed by 3/03/25 Actualizado el: 27-02-2025 Actualizado el: 03-03-2025 Editar
Rodrigo Olivares Cajas Dañada en area de empaque NGX Tomar datos de los tipos de cajas danadas en base al formato creado Enoc Gracia Closed Actualizado el: 10-02-2025 Editar
Rodrigo Olivares Cajas Dañada en area de empaque NGX Recopilar datos de nuevo con nuevo proceso para validar acciones tomada e indetificar el siguiente Top issue Enoc Gracia In progress Actualizado el: 10-02-2025 Datos se estan recopilando. Realizar pareto para el Lunes Actualizado el: 27-02-2025 Actualizado el: 03-03-2025 Editar
Daniel Ramirez UL Hipot Complain.. Fixtures for hipot validation,, All Areas Mtto to make the fixtures Alfredo Santillana in process; Residencial ya quedo. Pendiente commercial para dentro de 2 semanas (se realiza en forma manaul temporalmente) Actualizado el: 27-02-2025 Editar
Daniel Ramirez UL Complain Motor elvi File JackShaft Greg update files Roberto Ulloa Ya se sometio a UL y teradra aproximandemente 8 semanas. (Grreg Matias) Actualizado el: 27-02-2025 Editar
Daniel Ramirez Hipot Procedure update All Areas Mtto to Modify hipot procedure to match with current lines and hipots values. Alfredo Santillana In process Actualizado el: 14-02-2025 Preeliminar completed. Need pciture of the new fixture being procured. 2 semanas para que quede incluyendo su vverificacion y aprobacion Actualizado el: 27-02-2025 On time one more week Actualizado el: 03-03-2025 Editar
Roberto Ulloa Dummy For all the test equipment of all lines All Areas To review the most common or critical failure mode on equipment's. Roberto Ulloa Plan to be reviewed for approval. en 1 semana. Actualizado el: 27-02-2025 Plan de los dumm=ies que se necesitan. Una semama para crearlos Actualizado el: 03-03-2025 Editar
Roberto Ulloa Dummy For all the test equipment of all lines All Areas To review the most common or critical failure mode on equipment's. Tomas Perez In process Actualizado el: 27-02-2025 Actualizado el: 03-03-2025 Editar
Enoc Gracia Auditor de calidad reporta en linea de NGX un operador con faltante de componentes (carriage, rollo, bracket) y otro operador con faltante de kit NGX certificar 100% material final Enoc Gracia se encontraron 12 operadores con faltante de componentes Actualizado el: 17-02-2025 Editar
Ajuste de bascula para el modelo 37282RU Alfredo Santillana en proceso para lo demas numeros de parte Editar
Roberto Ulloa Material mezclado Accesorios Revisar racks Roberto Ulloa se revisaron racks Alfredo Santillana cerró la acción, 05-03-2025 19:06:38 Actualizado el: 05-03-2025 19:06:38 Actualizado el: 06-03-2025 01:06:57 Editar
Se podria cmabia de TH simple a crimpado para los switches; para poder llegar a cero issues. Roberto Ulloa Alex evaluara lo que costaria hacer este cambio de proceso; Se hicieron muestras manualmente Sw y J4 (caramelo) salieron bien hasta final de linea. Completar propuesta con comparativo de costo para tomar una desicion. 6, 500 (clinchando switches, caramelo J4). As per Xiomara, proceder con ADE para aprovacion Editar
Evaluar cambio de TH a crimpeado en switches. para eleimidar el problema a cero. Alejandro Duque En evaluacin Editar
Eduardo Vargas 21 pieces with the issue with serials, don't match in sanwa model NGX Produccion debera reforzar el uso correcto del scanner en secuenaci y tiempo. Rodrigo Olivares OPEN Editar
Roberto Ulloa Pruebas de CAT10 Accesorios Pruebas de CAT10 Roberto Ulloa Pruebas de CAT10 Roberto Ulloa cerró la acción, 06-03-2025 08:54:37 Actualizado el: 06-03-2025 08:54:37 Editar
Daniel Ramirez Dandole seguimineto al problema encontrtado en auditori UL en JS Comercial Evaluar posibilidad de migrar programa de impresion de etiquetas "UL rating labels" residencial a commercial. Dandole seguimineto ao problema encontrtado en JS Rodrigo Velazquez new Actualizado el: 10-03-2025 17:14:21 Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) NGX Keep identified the PCBAs received from any line Josias Ramirez In Process...... Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) NGX Evaluar top issues en Funcional de los datos mandados por Josias. 174 PCBA con codigo "FULL RUN DOWN" Alejandro Duque In Process...... Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) NGX Evaluar top issues en Funcional Rodrigo Olivares In Process...... Editar
Roberto Ulloa Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) NGX Test Nueva Accion Guillermo Maldonado Test Nuevo Status Editar