Alejandro Duque |
Cutting faston Terminal in COMBO PCBAS.
This cutting process was added to the process due of the lead of the terminal hit the Encoder Cover on the Residential operators
|
Electronicos |
Review if is possible to make a change in the encoder cover PN 40692A to avoid this issue. Slot in the plastic can help to eliminated this issue. |
Roberto Ulloa |
Roberto to mark up an encoder drawing to talk to Engineering for a quote to modify the cover. New worikng on it
Actualizado el: 10-02-2025
Actualizado el: 03-03-2025 |
|
Editar
|
Roberto Ulloa |
Evaluacion de tableros de combo 41145 que requieren reparacio/retrabajo |
Electronicos |
Evaluar top 5 issues en ICT de los datos mandados por Josias. Codigos de falla 5-23; R71; U3; IC y R76 |
Alejandro Duque |
Ya se indetyificaron los top5 ; 5-23 requieren analisis individual: los R71; reemplazar LGA; U3 y R76 problema de delaminacion (scrap); revisar metodo para idnetificar mejors en depanalizado.; IC requieren analisis individual.
Actualizado el: 10-02-2025
Pendiente status
Actualizado el: 27-02-2025 |
|
Editar
|
Roberto Ulloa |
Evaluacion de tableros de combo 41145 que requieren reparacio/retrabajo |
Electronicos |
Evaluar top issues en Funcional de los datos mandados por Josias. 174 PCBA con codigo "FULL RUN DOWN" |
Guillermo Maldonado |
de 24 del lote , 6 pasaron. Para comprobar intermitencia, probar estasn6 PCBA 20 veces; Contienur con buzqueda de causz raiz.
Actualizado el: 10-02-2025
Todas las veces (20) pasaron las pruebas.
Soldadura en un pad del BGA parece ser la cuaza raiz; todavia se evalaua para confirmar. Para lunes sabriuamos si es la causa o no.
Actualizado el: 27-02-2025
Memo ausente
Actualizado el: 03-03-2025
El proceso para confirmar causa raiz es desoldar y solder LGA nuevo, y regresar al "malo" de nuevo, sin embargo el fixture para desoldar LGA aun no esta disponible, manualmente es dificil soldar este componente (usando solo la pistola de calor), se esta evaluando soldar directo cada PAD de PCB a cada PAD LGA (con cables) y asi descartar insuficiencias o cortos.
Actualizado el: 13-03-2025 17:05:04 |
|
Editar
|
Roberto Ulloa |
FPY Electronics "Top issues de Diciembre" |
Electronicos |
Evalauar top issues en area de SMT en los paretos de Datos de Diciembre (Levantado y movidos en capacitores ) |
Alejandro Duque |
En evaluacion
Actualizado el: 10-02-2025
Pins set up improved? Como vamos?
Actualizado el: 24-02-2025
Pin set up verification and adjujstmest as needed; Colleting date thru February to look for pattern or any other action to take.
Actualizado el: 27-02-2025
Antes de limepza y ajuste.117 def. top 1,2 3 are D9, C17, C14 respectivamente.
Despues 79 en mismo periodo comparar contra produccion.
Actualizado el: 03-03-2025 |
|
Editar
|
Roberto Ulloa |
FPY Electronics "Top issues de Diciembre" |
Electronicos |
Evaluar top issues en area de TH en los paretos de Datos de Diciembre (Levantados en switches y Connecors e insuficiencia de soldadura en Switches y Diodos ) |
Guillermo Maldonado |
In proceso
Actualizado el: 10-02-2025
Failures were real. Looking to improved Switch holders
Actualizado el: 24-02-2025
se agrego peso a 2 holder y parece que funcionan mejor.
Holders tienen deformacion que pudiera estar causando el problema;
Actualizado el: 27-02-2025 |
|
Editar
|
Eduardo Vargas |
21 pieces with the issue with serials, don't match in sanwa model |
NGX |
1/23/25. Scanner time verification. Se verifico que el escaneo rapido cauza este problema. No se le puede agrear nadamas a PLC actual. Se necesitario una extension.
Evalaur costo y tiempo para agregar capacidad en PLC
|
Rodrigo Velazquez |
Alfredo S. (open).
Actualizado el: 27-02-2025
Actualizado el: 03-03-2025 El proyecto de expansión de rack del PLC está bajo Ricardo Ibarra. Fecha para recibir materiales e implementación es 14-ABR.
Actualizado el: 13-03-2025 17:08:19 |
|
Editar
|
Roberto Ulloa |
Incorrect Software Label on PCB 37418R, was labeled as the standard software |
Electronicos |
Need to define actios for incorrect Labeling process follow; Missing QA inspection during refill/reprinting |
Alejandro Duque |
Implementado bajo desviacion en 37418 ; Pendiente1/25/25 Un GCR en proceso para hacer esta mejora; Hacer una desviacion para implemetar ASAP. OMSs queddaran actualizas para Febrero 15 mas tardar. 1/13/25 GCR/GCO to merge 2 labels information inot one. Software version, Manufacture dtae and part number. Expected by 01/27/25
Actualizado el: 10-02-2025
Actualizado el: 27-02-2025 |
|
Editar
|
Roberto Ulloa |
Incorrect Software Label on PCB 37418R, was labeled as the standard software |
Electronicos |
Need to define actios for incorrect Labeling process follow; Missing QA inspection during refill/reprinting |
Andres Hernandez |
NO aplica para prodccion, solo acciones en area de elecgronicos 1/25/25 Un GCR en proceso para hacer esta mejora; Hacer una desviacion para implemetar ASAP. OMSs queddaran actualizas para Febrero 15 mas tardar. 1/13/25 GCR/GCO to merge 2 labels information inot one. Software version, Manufacture dtae and part number. Expected by 01/27/25
Actualizado el: 10-02-2025
Actualizado el: 10-02-2025 |
|
Editar
|
Roberto Ulloa |
Incorrect packing Labeled of part number 39934U.
Current print set up allows to print any model and associate incorrectly printed a different model(39934S) in a refill of packing labels, also he does not follow the process of send the first label of the refill to QA for Validation |
JackShaft |
Modify the setup of each packing label printers, the new set up is going to link the current model charged in the line with the printer, this is change will allow to the printer to only print the label of the model that the line is currently running and will not print any other model of label |
Rodrigo Velazquez |
IMpresora instalada y ligada a la estacion de empaque . Se monitoreara por unas semanas . Y revisar poder candadear el buton de pausa de la impresora. 1/27/25 Febrero 17 queda instalado para su validacion. /25/25 Rodrigo checara como vamos con esta actividad. 1/13/2025 waiting for update form manufacturing
Actualizado el: 10-02-2025
Completed
Actualizado el: 27-02-2025 |
|
Editar
|
Roberto Ulloa |
Incorrect packing Labeled of part number 39934U.
Current print set up allows to print any model and associate incorrectly printed a different model(39934S) in a refill of packing labels, also he does not follow the process of send the first label of the refill to QA for Validation |
JackShaft |
Revisar en que otras areas applica esta misma mejora |
Rodrigo Velazquez |
1/27/25 Febrero 17 queda instalado para su validacion. /25/25 Rodrigo checara como vamos con esta actividad. 1/13/2025 waiting for update form manufacturing
Plan preliminar de este project para la proxima junta
Actualizado el: 27-02-2025 |
|
Editar
|
Roberto Ulloa |
Pistola Bajo Torque |
Comercial |
Aumento de Frecuencia en el chequeo de Pistolas neumaticas.
Empezando desde la semana 39 se aumentara la frecuencia 3 veces por semana |
Roberto Ulloa |
done
Actualizado el: 10-02-2025 |
|
Editar
|
Roberto Ulloa |
Pistola Bajo Torque |
Comercial |
Verificar la excesiva variacion de los desamadores |
Alfredo Santillana |
Done
Actualizado el: 10-02-2025 |
|
Editar
|
Roberto Ulloa |
Pistola Bajo Torque |
Comercial |
Cambiar desarmadores criticos con mucha vairacion por nuevos desarmadores |
Alfredo Santillana |
Working on it; uno mas pendiente en Station 1 de SX ~ date; TBD Alfredo to provide it
Actualizado el: 27-02-2025
3 semans para cambair la que falta (critrica)
Actualizado el: 03-03-2025 |
|
Editar
|
Roberto Ulloa |
Pistola Bajo Torque |
Comercial |
Estudio de variacion de torque mostro que reguladores reducen la variacion mas del 50%; Agregar reguladores en desarmadores |
Alfredo Santillana |
Working on it
Actualizado el: 27-02-2025 |
|
Editar
|
Roberto Ulloa |
Pistola Bajo Torque |
Comercial |
Evaluar la instalacion de "acumuladores de aire comprimido" en cada line commercial para reducir aun mas la varicion de torque. |
Alfredo Santillana |
Working on it; Se puso en HOLD due to too much noise; Keep working on the other action to reduce/Eliminate variation
Actualizado el: 27-02-2025
Esta actividad favor de descartar, no es requerida en nuestro proceso.
Actualizado el: 13-03-2025 17:12:40 |
|
Editar
|
Roberto Ulloa |
Pistola Bajo Torque |
Comercial |
Revisar registro de mantenimiento de desarmadores para empezar a colectar datos que nos lleven a definir plan de mantenimiento preventido en lo que repecta a cambios de resortes. Resortes que tienen vida, la cual depende de la cantidad de veces que estos sean ajustado. Estimar cuando se tienen que cambiar lso resortesm antes de que presneten fallas que requieran mantenimiento "correctivo" . |
Alfredo Santillana |
Working on it
registrando datos para defir posibles mantenimientos preventivos
Actualizado el: 27-02-202
No se esta tomasdo este dato. Hacer una junta con Randy para que nos defina que hacer.
Actualizado el: 03-03-2025 |
|
Editar
|
Eduardo Vargas |
COVER con serigrafia borrosa |
NGX |
Evalaute new samples sent by PREMERE. |
Roberto Ulloa |
Parts are here; Evlaution by Wednesday 2/12/25
01/25/25 sanwa cover reported con mismo issue. Premere pendiente ocn feedback. 01/06/25 premere uPDATE NEEDED. 11/04/24. Se=giue el prolema reportadoa a PREMIER> Pedir undates 10/7/24 Evaluart samples ….thes should be at 093 already 9/30/24 PREMERE confirmo que mejoro la impresion de logo . Muetsra en caminos. 9/4/24 Eduardo mandara correo diario de los que salgan por turno.
Ultima mejora de PREMERe (dejo curar la pintura antes de empacar) las muestars mejoraron mucho. El siguiente recibo debe lleagr con la mejora apra hacer un muestreo mayor.
Actualizado el: 27-02-2025
Actualizado el: 03-03-2025 |
|
Editar
|
Eduardo Vargas |
COVER con serigrafia borrosa |
NGX |
Evalaute new samples sent by PREMERE. |
Alfredo Santillana |
Parts are here; Evlaution by Wednesday 2/12/25
01/25/25 sanwa cover reported con mismo issue. Premere pendiente ocn feedback. 01/06/25 premere uPDATE NEEDED. 11/04/24. Se=giue el prolema reportadoa a PREMIER> Pedir undates 10/7/24 Evaluart samples ….thes should be at 093 already 9/30/24 PREMERE confirmo que mejoro la impresion de logo . Muetsra en caminos. 9/4/24 Eduardo mandara correo diario de los que salgan por turno.
Actualizado el: 27-02-2025 |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
Electronicos |
Keep identified the PCBAs received from any line |
Josias Ramirez |
01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas
Actualizado el: 10-02-2025 |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
Electronicos |
PCBAs shall come separated from any production line to allow Josias to handle them better thru the proper route. Insrtead of sending them all to repair. |
Andres Hernandez |
01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas
Actualizado el: 10-02-2025 |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
Electronicos |
Make sure all PCBAs returned from any line are confirmed to be bad by "turning off and on" the problem before considering returning the PCBA as defectivre |
Alfredo Santillana |
01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
Electronicos |
All confirmed bad and rejected PCBAs shall be identify with at least on of the:
a) Symptom of the failure found
b) PCBA defect if known |
Alfredo Santillana |
01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
Electronicos |
The repair register sheet to be updated to add the failure or symptom the PCBA was report with; this will help to get to root causes of issues found and as trouble repair shooting data |
Guillermo Maldonado |
01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
Electronicos |
Take the repair station off the line; apart from production material to avoid mixed PCBAs (good and Bad) |
Alejandro Duque |
01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
Electronicos |
Repair instructions provided and then forgot them or not followed by new techs on such areas
Create OMSs for repair staions specifically for PCBA handling and identification |
Alfredo Santillana |
01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
Electronicos |
Create/Write procedure for proper dispostion of PCBAs being rejected from repair stations |
Roberto Ulloa |
01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
Electronicos |
Returned PCBAs rack to be identified for proper handling; Identify them by family, areas or PCBAs what ever is better |
Roberto Ricarte |
01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
Electronicos |
Definir/ crear area para trasbase de PCBAs de RT a area de reparacion |
Rodrigo Velazquez |
ARea, Rack listo; esperando a Ricarte para que mueva el material que esta en esa area. 01/24/25/ On time 01/13/25 Cage # 2 in electrocnis material stock placing are for thie material handling expected by end of Ferbuary due to some rack required not yet recieved 01/06/25 aREA DEFINED TO BE COMPLETED BY END OF jNAUARY 11/04/23 Ricarte y Rodrigo PENEIDNTES> Ultima revision con equipo antes d eparar el retrabajo en Elctronicos. 9/30/24 Rodrigo checara con Ricarte ( TEMPORAL). Para ver un ara dsiponible . 9/4/24 Pendiente. Area saliendo de electronicos espacio para 3 tarimas
Actualizado el: 10-02-2025
Actualizado el: 10-02-2025
Ya quedo el area definida con equipo requerido
Actualizado el: 27-02-2025 |
|
Editar
|
Roberto Ulloa |
Commerical Area with very old OMSs. |
Comercial |
PLAN para reeemplazar/actualizar las OMSs para commercial; |
Luis Vera |
Vera mando correo con porcentatje 30% 01/27/25 Linea SX Total modelos = 763, de los cuales 157 modelos se han corrido en 2024, Avance de actualizacion: Modelos ya actualizados con nuevo formato 43, en proceso de elaboracion 10, OMS en formato antiguo y pendientes de actualizar 103, fecha tentativa para finalizar los 103 modelos 05-Dic-2025
01/27/25 Linea HX Total modelos = 329, de los cuales 89 se han corrido en 2024, Avance de actualizacion: Modelos ya actualizados con nuevo formato= 42, en proceso de elaboracion 5, OMS en formato antiguo y pendientes de actualizar = 42 fecha tentativa para finalizar los 42 modelos = TBD
01/25/25 Plan con cantidades y porcenaje de progreso. 01/13/25 Still waiing for the information from Engineering (Look for Rodrigo/Brian email for details) 01/06/25 HS, HR, Trolley are completed; Dany/Brian to confirm % of progress.
Actualizado el: 10-02-2025
Actualizado el: 10-02-2025
Actualizado el: 10-02-2025
~1092 total number; 298 completed; 27% both lines todos los modelos; previous 30%-32% was for high runners only.
Actualizado el: 27-02-2025
Actualizado el: 10-03-2025 17:14:49 |
|
Editar
|
Andres Hernandez |
41145X accumulado despues de 3 reparaciones; Aprox 400pcs |
Electronicos |
Poner el lista de material pendiente por analisis mas detallado |
Josias Ramirez |
Cerrar esta task. se le da seguimineto en otra accion Que mas se necesita para cerrar este punto????
01/25/25 se mado correo con cantidades, fallas y origen de falla.
01/13/25 After checking all 2921 in stock, we got 862pcs (683 de ICT ; 10 de Progrmaming, 113 frequnecy ; 56 fucntiona); +2K were due to the original issue with tester already fixed.
Actualizado el: 10-02-2025
Actualizado el: 10-02-2025 |
|
Editar
|
Roberto Ulloa |
Evaluacion de mejora en estacion 8 de MZ. |
Comercial |
(mejorar manejo del receiver por posible daño) |
Andres Hernandez |
Adres confirmar en impacto para tomar desiciones 1/25/25 PENDING 01/13/25 Still Pending 01/6/25 CUANTIFICAR IMPACTO PARA DECIDIR 11/04/24 Evaluar ekl eimpcato en timepo de ciclo. No se ha visto problem ni en proceso ni de camnpo, era simplemente mejorar ocntinua, PONER en HOLD hasta terminar evalaucion/7/24 waiting to run this model to completed evaluation/verification. 9/30/24 Evaluar en corrida mas gfrande para confirmar 9/24/24 under evaluacion
Actualizado el: 10-02-2025
Actualizado el: 10-02-2025
Actualizado el: 10-02-2025
OMS to be completed by 3/03/25
Actualizado el: 27-02-2025
Actualizado el: 03-03-2025 |
|
Editar
|
Rodrigo Olivares |
Cajas Dañada en area de empaque |
NGX |
Tomar datos de los tipos de cajas danadas en base al formato creado |
Enoc Gracia |
Closed
Actualizado el: 10-02-2025 |
|
Editar
|
Rodrigo Olivares |
Cajas Dañada en area de empaque |
NGX |
Recopilar datos de nuevo con nuevo proceso para validar acciones tomada e indetificar el siguiente Top issue |
Enoc Gracia |
In progress
Actualizado el: 10-02-2025
Datos se estan recopilando. Realizar pareto para el Lunes
Actualizado el: 27-02-2025
Actualizado el: 03-03-2025 |
|
Editar
|
Daniel Ramirez |
UL Hipot Complain..
Fixtures for hipot validation,, |
All Areas |
Mtto to make the fixtures |
Alfredo Santillana |
in process; Residencial ya quedo. Pendiente commercial para dentro de 2 semanas (se realiza en forma manaul temporalmente)
Actualizado el: 27-02-2025 |
|
Editar
|
Daniel Ramirez |
UL Complain Motor elvi File |
JackShaft |
Greg update files |
Roberto Ulloa |
Ya se sometio a UL y teradra aproximandemente 8 semanas. (Grreg Matias)
Actualizado el: 27-02-2025 |
|
Editar
|
Daniel Ramirez |
Hipot Procedure update |
All Areas |
Mtto to Modify hipot procedure to match with current lines and hipots values. |
Alfredo Santillana |
In process
Actualizado el: 14-02-2025
Preeliminar completed. Need pciture of the new fixture being procured. 2 semanas para que quede incluyendo su vverificacion y aprobacion
Actualizado el: 27-02-2025
On time one more week
Actualizado el: 03-03-2025 |
|
Editar
|
Roberto Ulloa |
Dummy For all the test equipment of all lines |
All Areas |
To review the most common or critical failure mode on equipment's. |
Roberto Ulloa |
Plan to be reviewed for approval. en 1 semana.
Actualizado el: 27-02-2025
Plan de los dumm=ies que se necesitan. Una semama para crearlos
Actualizado el: 03-03-2025 |
|
Editar
|
Roberto Ulloa |
Dummy For all the test equipment of all lines |
All Areas |
To review the most common or critical failure mode on equipment's. |
Tomas Perez |
In process
Actualizado el: 27-02-2025
Actualizado el: 03-03-2025 |
|
Editar
|
Enoc Gracia |
Auditor de calidad reporta en linea de NGX un operador con faltante de componentes (carriage, rollo, bracket) y otro operador con faltante de kit
|
NGX |
certificar 100% material final |
Enoc Gracia |
se encontraron 12 operadores con faltante de componentes
Actualizado el: 17-02-2025 |
|
Editar
|
|
|
|
Ajuste de bascula para el modelo 37282RU |
Alfredo Santillana |
en proceso para lo demas numeros de parte |
|
Editar
|
Roberto Ulloa |
Material mezclado |
Accesorios |
Revisar racks |
Roberto Ulloa |
se revisaron racks
Alfredo Santillana cerró la acción, 05-03-2025 19:06:38
Actualizado el: 05-03-2025 19:06:38
Actualizado el: 06-03-2025 01:06:57 |
|
Editar
|
|
|
|
Se podria cmabia de TH simple a crimpado para los switches; para poder llegar a cero issues. |
Roberto Ulloa |
Alex evaluara lo que costaria hacer este cambio de proceso;
Se hicieron muestras manualmente Sw y J4 (caramelo) salieron bien hasta final de linea.
Completar propuesta con comparativo de costo para tomar una desicion.
6, 500 (clinchando switches, caramelo J4).
As per Xiomara, proceder con ADE para aprovacion |
|
Editar
|
|
|
|
Evaluar cambio de TH a crimpeado en switches. para eleimidar el problema a cero. |
Alejandro Duque |
En evaluacin |
|
Editar
|
Eduardo Vargas |
21 pieces with the issue with serials, don't match in sanwa model |
NGX |
Produccion debera reforzar el uso correcto del scanner en secuenaci y tiempo. |
Rodrigo Olivares |
OPEN |
|
Editar
|
Roberto Ulloa |
Pruebas de CAT10 |
Accesorios |
Pruebas de CAT10 |
Roberto Ulloa |
Pruebas de CAT10
Roberto Ulloa cerró la acción, 06-03-2025 08:54:37
Actualizado el: 06-03-2025 08:54:37 |
|
Editar
|
Daniel Ramirez |
Dandole seguimineto al problema encontrtado en auditori UL en JS |
Comercial |
Evaluar posibilidad de migrar programa de impresion de etiquetas "UL rating labels" residencial a commercial.
Dandole seguimineto ao problema encontrtado en JS |
Rodrigo Velazquez |
new
Actualizado el: 10-03-2025 17:14:21 |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
NGX |
Keep identified the PCBAs received from any line |
Josias Ramirez |
In Process...... |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
NGX |
Evaluar top issues en Funcional de los datos mandados por Josias. 174 PCBA con codigo "FULL RUN DOWN" |
Alejandro Duque |
In Process...... |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
NGX |
Evaluar top issues en Funcional |
Rodrigo Olivares |
In Process...... |
|
Editar
|
Roberto Ulloa |
Repairing station with unidnetified PCBAs; We went deep to understand source of the PCBAs and found to be returns from produciton Lines (NGX and Residential) |
NGX |
Test Nueva Accion |
Guillermo Maldonado |
Test Nuevo Status |
|